A dynamic and very well prepared team in mechanical, electrical and plumbing (MEP) engineering design made by engineers and draftsmen with technical university degree for building service engineering or electrical engineering.

The team has a constant support from our Romanian authorized MEP project checkers, engineers with more than 35 years in their field. We also have support from Bucharest Building Services Engineering University for our most challenging energy saving green projects.

From Portfolio

Unitate microproductie, ambalare si depozitare produse de curatenie si cosmetice SANO (2009)

In the enclosure we design a hall with the surface of 4600 mp, with the destination of production, packing and storage for cleanness and cosmetic ...(more)

Hotel Novotel Bucuresti (2003)

Novotel Hotel has 3S+P+3M+11E levels and 277 rooms. The hotels contains polyvalent halls, meeting rooms, commercial galleries, restaurants, bars, ...(more)